成人综合色网-成人综合色欲久久久久-成人综合网在线-成人综合一区-成人综合永久-成人综合在线网

Effective measures to deal with the pollution of stone curtain wall veneer

Date: 2023-10-23

Read: 3743

Response to white pollution
The dry hanging construction method can effectively avoid the problem of whitening, but considering the high cost of stone dry hanging, it is mainly used for the external walls of good buildings. For some small and medium-sized buildings, wet construction of the bottom stone hanging, while the stone to take protective treatment, that is, the back and sides of the stone injected resin, to avoid alkaline cement mortar and stone contact, play an isolating role, stone holes are also closed, effectively prevent water infiltration. In addition, the back of the stone becomes a sticky hairy surface, which can be better combined with cement mortar. When fixing the SLATE, apply the gap at the joint of the two plates evenly with glue, which can improve the tightness and effectively prevent water seepage. Mix the low-alkali cement with the sand in a ratio of 1:3.

Response to rust stain contamination
The board before installation is thoroughly cleaned to remove iron residue and rust, and the resin is injected into the stone for waterproof treatment to prevent the iron minerals inside the stone from being oxidized and leaking to the surface. Try to use dry hanging construction method, use stainless steel accessories. Use protective paint to paint other iron products on the wall and maintain them frequently to prevent rust.

Water stains, wet marks pollution response
As far as possible, the dry hanging construction method is used to waterproof the permeable areas such as balconies and wall bases, giving the stone a new feature of waterproof and antifouling, which can effectively avoid the occurrence of water spots.

Response to frost damage pollution
The stone will lose its surface luster after being damaged by frost damage, and in serious cases it will break after the force impact, resulting in falling accidents. The countermeasures are mainly to inject resin into the stone to make it waterproof, if it is wet construction, it must also take a more comprehensive resin injection of the stone, and the sealant caulking project is also more necessary.

Stone cracking pollution response
The marble to be hung on the exterior wall is pre-cured, and the marble block by block is treated with strengthening agent. The hardness of the stone has been effectively improved, the natural luster of the surface is brighter, the weather resistance is better, and the service life is longer.

Response to bryophyte growth and microbial damage pollution
Water is the main factor for the growth of plants and microorganisms, so to avoid pollution, we must first do a good job of stone drainage measures, followed by the protective agent into the stone interior, the protective agent can not only effectively protect, but also strengthen the stone and increase the bond strength.

Top

主站蜘蛛池模板: 国产欧美日韩在线中文一区 | 91精品隔壁老王在线观 | 午夜成人福利电影 | 欧亚日韩| 在线播放真实国产乱子伦 | 国产拍拍拍在线观看视频免费 | 国产福利影院在线 | 亚洲国产日韩欧 | 日本一区二区不卡中文字幕 | 在线观看免费人成视频网 | 性荡视频播放在线视频 | 国产91丝袜在线精品 | 欧美婬荡的护士hd中文幕s | 在线看视频 | 手机免费在线观看完整版 | 日本最新在线观 | 精品福利一区二区在线观看 | 日产乱码一二三区别免费下 | 日韩欧美亚洲国产一区 | 91密臀在线播放 | 欧美大片va欧美在线播放 | 色8激情欧| 免费看涩涩视频网站入口 | 91成人免费观看在线观看 | 中文字幕美日韩在线高清 | 日韩不卡在线观看 | 91日韩欧美 | 亚洲国产尤物高清在线观看 | 粗大的内捧猛烈进出在线视频 | 欧美国产日本韩在线 | 日韩欧美另类一区二区三区 | 日韩电影手机免费在线看 | 肉色超薄丝袜脚交一区二区 | 亚洲欧洲| 成人看免费一级毛 | 日本亲子乱在线播放 | 欧洲影院 | 国产www尤物精品在线观看 | 国产精品福利在线72国 | 国产盗摄视频一区二区三区 | 午夜视频久 |